Concentric/Concentric Reducer SS304 Reducer BW ReducerHebei canghai

  • Manufacturing Process:SEAMLESS
  • Nominal Size:12x10" NS、22x10" NS、8x6" NS,etc.
  • Wall Thickness::20.62x18.26 mm Thk、15x12 mm Thk,etc.
  • Standards Compliance:ISO 15590、MSS SP - 75、ASME B16.9,etc.

Hebei Canghai Nuclear Equipment Technology Co., Ltd.

The reducing pipe is a kind of pipe fitting used to connect two sections of pipelines with different diameters. It can smoothly achieve the transition of the fluid in the pipeline when there is a change in diameter. According to the shape, it is divided into concentric reducing pipes and eccentric reducing pipes. 

Request a Quote

PRODUCTS DETAILS

Product Detail


Reducer Type
Seamless reducer; Welded reducer;
Concentric reducer; Eccentric reducer;
butt welding reducer; forged reducer;
forging reducer; welding reducer;

Size
OD. 1/2'' ~ 48''(Seamless); 16'' ~96''(welded); DN15-DN1200

WTK.
Sch10SCH20,SCH30,STD,SCH40,SCH60,XS,SCH80,SCH100,SCH120,SCH140,SCH160, XXS







Standard
ASME B16.9-2007 
ANSI/ASME B16.11
ASME B16.25-2007
ASME B16.5-2007
EN10253-1-1999 EN10253-2-2007 EN10253-3-2008 EN10253-4-2008
DIN2605-1-1992 DIN2605-2-1995
JIS B2311-2009 JIS B2312-2009 JIS B2313-2009
GB/T12459-2005 GB/T13401-2005 GB/T10752-2005 
SH/T3408-1996 SH/T3409-1996
SY/T0609-2006 SY/T0518-2002 SY/T0510-1998 
DL/T695-1999 GD2000 GD87-1101
HG/T21635-1987 HG/T21631-1990 ,           
MSS SP-43, MSS SP-95, MSS SP-75, MSS SP-79;
ISO 3419,ISO 5251,DIN 2616








Material




Carbon  steel
ASTM A234 WPB,
ASTM A420 WPL6, WPL3;
ASTM A105 WPB;
ASTM A106;
ASTM A350 LF2,
DIN St37, St45.8, St52.4,St.35.8,St.35.8
ASTM A333 GR.6,
ASTM A860 WPHY 70, WPHY 65, WPHY 60, WPHY 52,WPHY 46,WPHY 42,
API 5L GRB, X60, X65, X42,X52,
Stainless steel ASTM A403 WP304, A403 WP304L, A403 WP316, A403 WP316L, A403 WP321
ASTM A182 F 304, 304L,316, 316L,904L


Alloy steel
ASTM A234 WP12, A234 WP11, A234 WP22, A234 WP5, A234 WP9
A420 WPL8, A420 WPL9
ASTM A335 P5, P9, P11, P12, P22, P91
ASTM A213
ASTM A182 F5,F11,F22,F91
Brand Canghai Nuclear
Surface Black painting, varnish paint, anti rust oil, hot galvanized, cold galvanized, 3PE, etc.
Manufacturing process Push, Press, Forge, Cast, etc.
Connection welding
Technical Welded, forged
Packing Wooden cases, pallets, nylon bags or according to the customers' requirements
Delivery time 7-35 days after your advance payment
Payment terms L/C at sight, T/T
Shipment FOB Tianjin, CIF, CFR, etc
Remarks Other materials and drawings are available
Capacity 1000000tons/year

Advantages
1. Reasonable price with excellent quality
2. Abundant stock and prompt delivery
3. Rich supply and export experience, sincere service
4. Reliable forwarder, 2-hour away from port.

Product Display

异径管(1).jpg

Packing&shipping

FAQ

1. Are you a factory or trading company?
We are a factory.

2. How can I get a quotation from you ?
You can leave us message, and we will reply every message in time. Or we may talk on line by Trademanager.
And you can also find our contact information on contact page.

3.Can I get samples before order ?
Yes, of course. we can produce by your samples or technical drawings. 

4. what is your delivery time ?
The time of delivery is usually around 20 days(1*20FT as usual).
We can send out in 2 days, if it has stock.

5.What is your payment terms?
Our usual payment term is 30% deposite, and rest against B/L. L/C is also acceptatble.EXW,FOB,CFR,CIF,DDU.

6.How does your factory do regarding quality control?
Quality is priority. Our factory has gained ISO9001 authentication. We guarantee the goods out from our factory 100% qualified.
And Each Process, we have very strict operation and arrange 2 techinians to inspect. After the products are finished,
we will make the last test to pick up the unqualified products

7.What is your MOQ?
As your reqiurements

 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours

Leave YourMessage

Thank you! We will reply you via email within 24 hours.

Return